Figure 003-6 Mounting Of The Pim - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 6/37
Installation of Main Equipment
(5) Mount the PIM on the BASE, and connect them together using 3 bolts (provided). Refer to
Note:
The PIM must be mounted over the 4 RACK PART screws previously installed in step 2(b).
FRONT
Note:
The Battery Module (BATM) and/or the MDF Module (MDFM) can be installed in the same man-
ner as the PIM.
CHAPTER 3
Page 28
Revision 2.0

Figure 003-6 Mounting of the PIM

ND-45492 (E)
Figure
Note
PIM
BASE
003-6.

Advertisement

Table of Contents
loading

Table of Contents