Figure 003-10 Cable Connection Between The Pz-Pw86 And The Bwb - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 12/37
Installation of Main Equipment
(9) Confirm the connection of the PWR CNT CA-A and power output cables as shown in
(These cables are pre-installed).

Figure 003-10 Cable Connection between the PZ-PW86 and the BWB

CHAPTER 3
Page 34
Revision 2.0
CARD SLOT AREA
LTC CONNECTOR AREA
PWR CNT CA-A
POWER OUTPUT CABLE (CR,E)
POWER OUTPUT CABLE (+5V, -27V, E)
PIM
BWB (Back Wiring Board)
PWR0B PWR0A
RS
PWR1
ND-45492 (E)
Figure 003-10
PZ-PW86

Advertisement

Table of Contents
loading

Table of Contents