Figure 3-2 Procedure Flowchart (2 Of 2) - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

A
MOUNTING
OF
CIRCUIT CARDS
TYPE OF SYSTEM
SYSYEM INITIALIZATION
AND
SYSTEM DATA ENTRY
OPERATION TEST
CLEANING
AND
VISUAL CHECK
MOUNTING OF THE FRONT COVER
END
The mark shown below is attached to the NAP sheet for each procedure in which circuit cards are handled. When
doing such a procedure, the installer must perform the procedure with caution, to prevent damage caused by stat-
ic electricity
(See section
NAP- 200-008
Back up MP System
Single MP System
NAP- 200-010
NAP- 200-011
NAP- 200-012
NAP- 200-013

Figure 3-2 Procedure Flowchart (2 of 2)

1.2, "Static Electricity Precautions" in this chapter).
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
ND-45492 (E)
INSTALLATION OF
BACK UP MP SYSTEM
NAP- 200-009
CHAPTER 3
Page 17
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents