Figure 003-26 Mounting The Pim To The 19-Inch Rack (1 Of 2) - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 31/37
Installation of Main Equipment
(2) Secure the 19" BRACKET to the 19-inch Rack as shown in
(3) Mount the PIM on the 19" BRACKET as shown in
Then, secure the PIM to the 19" BRACKET as shown in
19" BRACKET
BOTTOM COVER
B
C
PIM
FRONT

Figure 003-26 Mounting the PIM to the 19-Inch Rack (1 of 2)

Figure 003-26
Figure 003-26
Figure 003-26
19" BRACKET
PIM
ND-45492 (E)
.
A
.
B
.
C
19-INCH RACK
A
CHAPTER 3
Page 53
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents