Figure 003-13 Ac Power Cable Wiring For Two-Frame Configuration - NEC NEAX 2000 IVS Installation Manual

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 15/37
Installation of Main Equipment
(c) When the system is a two-frame configuration, the 3P AC Power Cable of the left side frame can go
through the BASE of the right side frame, as shown in
FG

Figure 003-13 AC Power Cable Wiring for Two-Frame Configuration

NEUTRAL LINE
ND-45492 (E)
Figure
003-12.
FG
NEUTRAL LINE
SUPPLEMENTARY GROUND
(TO COLD WATER PIPE, ETC.)
3P AC POWER CABLE
TO 120/240 V AC
SOURCE POWER
CHAPTER 3
Page 37
Revision 2.0

Advertisement

Table of Contents
loading