NAP 200-003
Sheet 30/37
Installation of Main Equipment
3. 19-Inch Rack-Mounting Installation
3.1. Single-PIM Installation
(1) Before mounting the PIM, connect the TOP COVER, BOTTOM COVER and AC CORD-A to the PIM as
shown in
Figure
LOCAL CABLE DUCT
Figure 003-25 Connecting the Covers and AC CORD-A to the PIM
CHAPTER 3
Page 52
Revision 2.0
003-25. The AC CORD-A is pre-installed with the BOTTOM COVER.
PWR CA-A/BUS CABLE DUCT
TOP COVER
BOTTOM COVER
ND-45492 (E)
PIM
TO PZ-PW86
AC CORD-A