NEC NEAX 2000 IVS Installation Manual page 68

Hide thumbs Also See for NEAX 2000 IVS:
Table of Contents

Advertisement

NAP 200-003
Sheet 29/37
Installation of Main Equipment
(6) Connect the bottom PIM and the BASE, and connect PIMs to each other using 3 bolts (provided), as shown
in
Figure 003-6
gether with 4 screws (provided), as shown in
(7) Connect the AC CORD-B to the terminals inside the BASE in the same manner as for the Floor Standing
Installation (Refer to
(8) When the system is a multiple-PIM configuration, connect the PZ-PW86 cards to each other using PWR
CA-A cables (Refer to
(9) When the system is a multiple-PIM configuration, mount the PN-BS00 card in the BUS slot of PIM0, and
mount the PN-BS01 card in each BUS slot of PIM1 through PIM7 (Refer to
Then, connect all the BUS cards (PN-BS00/PN-BS01) to each other using BUS cables (Refer to
003-17
and
Figure
and
Figure
003-7. Then, position the TOP COVER on the top PIM and connect them to-
Figure 003-11
through
Figure 003-14
through
003-18).
Figure
003-8.
Figure
003-13).
Figure
003-15).
ND-45492 (E)
Figure
003-16).
Figure
CHAPTER 3
Page 51
Revision 2.0

Advertisement

Table of Contents
loading

Table of Contents