NAP 200-002
Sheet 1/3
Marking and Drilling
1. Confirmation of the Equipment Layout
Install the equipment in an area which provides adequate ventilation and is easily accessible to service person-
nel.
2. Marking
2.1. Floor Standing
•
Referring to
Figure
•
Mark the installation holes for the external MDF, if required.
39 mm (1.54 inch)
110 mm (4.33 inch)
35 mm (1.37 inch)
37 mm (1.46 inch)
CHAPTER 3
Page 20
Revision 2.0
002-1, mark the installation holes for the main equipment.
RACK PARTS
356 mm (14.01 inch)
430 mm (16.93 inch)
FRONT
Figure 002-1 Floor Marking for Main Equipment
ND-45492 (E)
WALL
RACK PARTS
356 mm (14.01 inch)
430 mm (16.93 inch)
5 mm (0.19 inch)
FRONT
40 mm (1.57 inch)
184 mm (7.24 inch)
37 mm (1.46 inch)