NEC 2400 Integration Manual page 48

Intuity integration with nec neax 2400 switch
Table of Contents

Advertisement

Hardware Installation
Table 4-3. MCI I/O Port DIP-Switch SW02 or SW12 Settings for Switches 1
through 8
Switch
Number
1
2
3
4
5
6
7
8
3. Connect one end of a 25-pair cable to the MCI I/O port on the switch.
To create the cable, refer to Table 4-4 for the correct cable pinouts.
4-6
Issue 2 December 1995
Setting
Function
ON
When PB lead is - terminal is busy
OFF
When PB lead is + terminal is busy
ON
DTR signal is always ON
OFF
DTR signal is controlled by the CPU
ON
DSR signal is not provided
OFF
DSR signal is provided
ON
CD is not provided
OFF
CD is provided
ON
CS is not provided
OFF
CS is provided
ON
CI is not provided
OFF
CI is provided
ON
PB signal is not provided
OFF
PB signal is provided
OFF
Not used
NOTE:
Recommended Default Settings:
If you use port 0, configure switches 01 and 02. If you use
port 1, configure switches 11 and 12.
Standard switch settings for SW01 or SW11 are 1 ON, 2 OFF,
3 ON, 4 OFF, 5 OFF, 6 OFF, 7 ON, and 8 ON.
Standard switch settings for SW02 or SW12 are 1 ON, 2 ON,
3 ON, 4 ON, 5 ON, 6 ON, 7 ON, and 8 OFF.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neax 2400

Table of Contents