Procedure
Step 1 Based on the cross-sectional area of the cable conductor, strip a length of insulation coating C
to expose the conductor D of length L1, as shown in
L1 are listed in
Figure 5-2 Stripping a power cable (OT terminal)
l When you strip a power cable, do not damage the conductor of the cable.
l If the bare crimping terminal is not provided by Huawei, the value of L1 is 1 mm (0.04 in.)
Table 5-1 Mapping between the cross-sectional area of the conductor and the value of L1
Cross-
Sectional Area
of Conductor
(mm
1 (0.002)
1.5 (0.002)
2.5 (0.004)
4 (0.006)
6 (0.009)
Issue 11 (2015-05-18)
Table
5-1.
NOTICE
to 2 mm (0.08 in.) greater than the value of L.
Value of L1 (mm
(in.))
2
2
(in.
))
7 (0.28)
7 (0.28)
7 (0.28)
8 (0.31)
9 (0.35)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
5-2. The recommended values of
Cross-Sectional
Area of Conductor
2
2
(mm
(in.
))
10 (0.015)
16 (0.025)
25 (0.039)
35 (0.054)
50 (0.077)
5 Appendix
Value of L1 (mm
(in.))
11 (0.43)
13 (0.51)
14 (0.55)
16 (0.63)
16 (0.63)