NEC Express5800 Series Maintenance Manual page 164

Express server
Hide thumbs Also See for Express5800 Series:
Table of Contents

Advertisement

Chapter 2 Useful Features
4.
Select "Go", and press the <Enter> key.
5.
Change the "Drive Group" for which the Rebuild is performed to "Enabled", place a cursor on "OK", and
press the <Enter> key.
6.
The following message is output, and the Rebuild starts.
7.
Select Drive Management and press the <Enter> key to check the Rebuild status.
8.
After completion of the Rebuild, the status of the Physical Device for which Rebuild was performed is
"Online".
164
Express5800/B120f Maintenance Guide
4. RAID System Configuration

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/b120f

Table of Contents