Operation Timing And Processing Time Of Opr Control - Mitsubishi Electric MELSEC Q Series User Manual

Positioning module
Hide thumbs Also See for MELSEC Q Series:
Table of Contents

Advertisement

8.4

Operation Timing and Processing Time of OPR Control

This section explains the operation timing and processing time of OPR control.
OPR control
OPR start signal
BUSY signal
OPR start complete signal
OPR request signal
OPR complete signal
*1
This is an indication of internal commands, and does not match with the actual analog output waveform.
The following values apply to t1 to t3.
t1
0.7 to 1.2ms
v
*1
t1
ON
OFF
(Y20)
ON
OFF
(X14)
ON
OFF
(X20)
ON
(X12)
ON
OFF
(X13)
t2
0 to 0.5ms
t2
OFF
t3
0 to 0.5ms
CHAPTER 8 OPR CONTROL
t
t3
183
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-q qd73a1

Table of Contents