Commissioning
4.4 Creating a project offline in Startdrive
4.4.8.3
Adding a Terminal Board
Requirement
● A project has been created.
● A Control Unit is contained in the device configuration.
● No Communication Board CBE20 is contained in the device configuration.
TB30 and CBE20 cannot be created simultaneously in the device configuration.
132
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1