Loading the project to the target device

In order to set up your project, you need to load the project data you generated offline on the
connected drive units. This project data is generated, for example when configuring
hardware, networks, and connections or when programming the user program or when
creating recipes.
Precondition
● The project data is consistent.
● Each drive unit to be loaded can be accessed online.
Perform download
In order to execute this function in the online mode, the following operator actions are
alternatively available:
1. Select one or more drive units in the project tree.
2. Open the shortcut menu "Load to device" or click on the icon
toolbar.
– If you have already established an online connection, the "Load preview" dialog
– If you have not yet established any online connection, the "Extended loading" dialog
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
opens. This dialog displays alarms and proposes actions necessary for loading.
opens and you must first select the interfaces with which the online connection to the
device should be established. You have the option of showing all compatible devices
by selecting the corresponding option and clicking the "Start search" command.
See also Section "Establishing an online connection to the drive unit (Page 137) "
4.8 Loading the project to the target device
(Load to device) in the
Commissioning