3. Check the alarms in the "Upload preview" dialog, and select the necessary actions in the
"Action" column.
As soon as uploading becomes possible, the "Upload from device" button is enabled.
4. Click the "Upload from device" button.
The loading operation is performed.
Result
The project data has been loaded from the drive unit into your Startdrive project on the PC.
Commissioning with Startdrive
Commissioning Manual, 11/2017, 6SL3097-4AA10-0BP1
3.7 Loading project data from a drive unit
Fundamentals