FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
(1) Spacer
Spacers delivered with the bases have two specifications: 2 mm and 5 mm thick.
Step 8 Insert a twistlock into the mounting hole in a single-capacity base and keep the lock head in
the pre-fab. module length direction.
Step 9 Pre-mount the nuts onto the twistlocks using an adjustable wrench.
Figure 4-12 Installing a twistlock for a single-capacity base
Issue 02 (2020-01-15)
Figure 4-11 Installing the washer
Copyright © Huawei Technologies Co., Ltd.
4 Installing Pre-fab. Modules
(2) Base