After the FusionModule1000 installed, verify the installation as described in
Table 9-1 Installation checklist
No.
1
2
3
4
5
6
Issue 02 (2020-01-15)
9
Check Item
Pre-fab. module
installation
Equipment
appearance
Water pipe
connections
Thermal insulation
layers on water pipes
External grounding
Cable connections
Copyright © Huawei Technologies Co., Ltd.

Installation Verification

Check
Expected Result
Method
The installation conforms to the design
Observe
requirements.
Observe
The equipment is intact and free from
inclination, distortion, pain drop, and
rust.
All connections are secure.
Observe
Water pipes are securely connected.
All pipes are seamlessly wrapped with
Observe
thermal insulation layers.
Observe
Each pre-fab. module has at least two
ground points and is grounded securely
with a ground resistance of 10 ohms or
less.
Each row of cable trays has at least two
ground points and is grounded securely
with a ground resistance of 10 ohms or
less.
All cable connections are secure,
Observe
especially network cable connections.
Bear cables and terminal barrels near
wearing terminals are wrapped in
insulation tape or heat shrink tubing.
Flat washers and spring washers of all
wiring terminals are securely installed.
Cables are routed in the way convenient
for future maintenance and expansion.