FusionModule1000A40 Prefabricated All-in-One
Data Center
Installation Guide
After the FusionModule1000 installed, verify the installation as described in
12-1.
Table 12-1 Installation checklist
No.
1
2
3
4
5
Issue 07 (2022-12-15)
12
Check Item
Pre-fab. module
installation
Equipment
appearance
Water pipe
connections
Thermal insulation
layers on water
pipes
External grounding
Copyright © Huawei Digital Power Technologies Co., Ltd.

Installation Verification

Check
Expected Result
Method
Observe
The installation conforms to the
design requirements.
Observe
● The equipment is intact and free
from inclination, distortion, pain
drop, and rust.
● All connections are secure.
Observe
Water pipes are securely connected.
Observe
All pipes are seamlessly wrapped with
thermal insulation layers.
Observe
● Each pre-fab. module has at least
two ground points and is grounded
securely with a ground resistance
of 10 ohms or less.
● Each row of cable trays has at least
two ground points and is grounded
securely with a ground resistance
of 10 ohms or less.
12 Installation Verification