Figure 9-9 Unlocking the indexing plunger handles
Slide cabinets in row A from the middle towards the cabinet rear door until
they cannot be moved.
Figure 9-10 Pushing the cabinet
Put the RF_Z antenna through the gap between the front of the cabinet and
the pre-fab. module ceiling, and attach the antenna to the top of cabinet A1.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Installing Devices Inside Pre-fab. Modules