Huawei FusionModule1000A40 Installation Manual page 91

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Installation Guide
5.
6.
7.
Issue 07 (2022-12-15)
Figure 9-11 Installing the RF_Z antenna
(1) RF_Z antenna
Route the RF_Z antenna through the cable hole at the top of cabinet A1 into
cabinet A1, and route it out of the cabinet through the cable manager.
Lock the indexing plungers at the rear of cabinets in row A, and push the
cabinets to the middle. The axes of the indexing plungers at the front of
cabinets in row A automatically spring out to lock the indexing plungers and
secure the cabinets in position.
Attach the 4G antenna to the top of the strong-current cable feeder window
on the pre-fab. module.
NO TICE
– After routing the 4G antenna cable into the pre-fab. module through its
ELV feeder window (No. 11), seal the port in the feeder window using
sealing putty.
– The cable outside the pre-fab. module must be fit with a corrugated metal
hose.
– The cable outside the pre-fab. module can be bent only in the U-shape.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Installing Devices Inside Pre-fab. Modules