A.1.7 Attaching Cable Labels
Prerequisites
Clear and specific label information facilitates future pre-fab. module maintenance work.
Preparations
Tool: pen
Material: label
Documents: none
Skill requirement: common technician
Procedure
Step 1 (Optional) Prepare labels based on site requirements.
● Label information must be clear and specific.
● Labels must be easy to attach and can be securely attached.
● Labels must be resistant to corrosion and deterioration.
Step 2 Select correct cable labels.
Step 3 Remove the simple labels attached to a cable during layout and attach the
selected labels to both ends of the cable.
Issue 07 (2022-12-15)
Cables have been connected.
You are clear about the connections of cables to be labeled.