4.
Step 2 Attach the 4G antenna to the top of the cable feeder window on the pre-fab. module.
After routing the 4G antenna cable into the pre-fab. module through its ELV feeder
window (No. 8), seal the port in the feeder window using sealing putty.
The cable outside the pre-fab. module needs to be fit with a corrugated metal hose. For
details, see
The cable outside the pre-fab. module can be bent only in the U-shape.
Figure 6-26 Installing the 4G antenna
Step 3 Attach the RF_Z antenna on the top of the monitoring box.
Issue 02 (2020-01-15)
Figure 6-25 Installing the Micro SD and SIM card
Reinstall the ECC800 main control module in the ECC800 subrack.
A.1 Cable Installation
Copyright © Huawei Technologies Co., Ltd.
6 Installing Devices Inside the Pre-fab. Module