2.1 Site Selection Requirements

2.2 Field Requirements

The FusionModule1000 can be installed on bases or concrete platforms depending on the
actual scenario. The site requirements vary with the selected installation mode.

2.2.1 (Optional) Concrete Platform Scenario

Issue 02 (2020-01-15)
The power supply is stable and reliable.
The communication and traffic or convenient.
The site is far away from dust, smoke, harmful gas, and corrosive, flammable, or
explosive objects.
The site is not on a low-lying land, and above the highest water level of that area.
The site is far away from sources of strong variation, loud noises, and strong
electromagnetic interference.
The ground is solid without spongy or soft soil, and is not prone to water aggregation or
subsidence.
The site is in an open area, meets the pre-fab. module installation and maintenance
requirements.
The site is far away from a class D environment or at least 500 m away from the
seashore.
Build concrete platforms on the selected installation site.
Copyright © Huawei Technologies Co., Ltd.
2

Site Requirements

2 Site Requirements