Huawei FusionModule1000A20 Installation Manual page 79

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Figure 7-3 Connecting the input cable of PDB (02404913)
Figure 7-4 Connecting the input cable of PDB (02402732-009)
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
7 Installing a Cable Outside a Pre-fab. Module
73

Advertisement

Table of Contents
loading

Table of Contents