Line Supply Cable - Siemens SINAMICS S120 Combi Equipment Manual

Hide thumbs Also See for SINAMICS S120 Combi:
Table of Contents

Advertisement

S120 Combi Power Modules
4.8 Electrical connection
4.8.2

Line supply cable

Shielded MOTION-CONNECT 500 and 800 line supply cables are recommended in order to
maintain the EMC limit values. The line supply cable is connected at interface X1 (INPUT).
The single cores of the cable are labeled with U, V, W and PE. Cables are connected at the
S120 Combi corresponding to the terminal labeling.
The cable shield should be connected and fixed using the shield clamp.
Figure 4-25
NOTICE
Damage when strain relief is not used
The shield clamp does not provide strain relief. In the event that strain relief of the power
cable is not carried out separately using appropriate measures, the shield connection clamp
may be damaged.
• Install additional strain relief for the power cable.
NOTICE
Damage to unshielded power cables due to shield connection clamps
When using unshielded power cables, the unshielded individual cores can be damaged by
the shield connection clamp.
• Only use the shield connection clamp for shielded power cables.
116
Shield connection clamp
Line supply cable
Line supply cable connected at the S120 Combi
SINAMICS S120 Combi
Manual, (GH9), 07/2016, 6SL3097-4AV00-0BP5

Advertisement

Table of Contents
loading

Table of Contents