UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Figure 6-78 Installing mounting plates
----End
6.4.3 Installing the UPS + Top Outlet Kit
●
●
6.4.3.1 Installing Cabinets
Installation on the Floor
Ensure that the installation floor is level.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
Issue 03 (2021-08-03)
If the top outlet kit is configured, installation against a wall is supported.
The following procedure applies to installation against a wall. If cabinets are
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and
the anchor screws at the bottom.
NO TICE
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor
Copyright © Huawei Technologies Co., Ltd.
6 Installation
126