Installing Cabinets - Huawei UPS5000-H User Manual

400 kva-800 kva. 100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)

6.4.4.1 Installing Cabinets

Installation on the Floor
Ensure that the installation floor is level.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
Figure 6-88 Hole dimensions (unit: mm)
(1) Bottom cabling cabinet (optional)
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion sleeves in the holes.
1.
2.
3.
4.
Issue 03 (2021-08-03)
NO TICE
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor
Drill a hole into the concrete floor using a hammer drill. The hole depth
ranges from 52 mm to 60 mm.
Slightly tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Copyright © Huawei Technologies Co., Ltd.
(2) UPS
6 Installation
132

Advertisement

Table of Contents
loading

Table of Contents