Download Print this page

NEC SL2100 Hardware Manual page 166

Hide thumbs Also See for SL2100:

Advertisement

ISSUE 4.0
2.
Route the cable through the channel as shown in
3.
Connect the other end of the cable to your TCP/IP network.
When the base station powers on, the STATUS LED on the front briefly lights orange and then
turns off while it initializes and connects to the network. After the base station successfully
initializes and connects to the network, the LED lights green and remains steady on.
Table 2-38 Base Station LEDs States and Meanings
meanings.
Table 2-38 Base Station LEDs States and Meanings
Color
State
Green
Flickering
Green
Steady on
N/A
Off
Orange
Briefly on
Orange
Flickering
Red
Blinking
Red
Blinking
Red
Flickering
Red
Steady on
6.5.2
Wall Mounting the Base Station
Follow the steps below to mount the base station to a wall.
INSTALLING WIRELESS DECT TELEPHONES
Figure 2-173 Connecting the Base Station
Stage in base flash memory rewrite at the end of the base firmware update.
All operations normal.
No power in unit
OR
initializing and connecting to the network.
Powering on.
Stage in base flash memory rewrite at the end of the base firmware update.
Factory reset warning. A factory reset has been initiated or is in progress.
No Ethernet connection available
OR
handset registration failed.
Stage in base flash memory rewrite at the end of the base firmware update.
Critical error. Contact technical support.
Figure 2-173 Connecting the Base
provides a list of base station LEDs and their
Meaning
SL2100
Station.
164

Advertisement

loading