Download Print this page

NEC SL2100 Hardware Manual page 50

Hide thumbs Also See for SL2100:

Advertisement

ISSUE 4.0
Figure 2-14 Horizontal Arrangement of Chassis and Battery Boxes
1.6 Rack Mounting the Chassis
Main or Expansion chassis can be put into 19 inch rack using a shelf plate one by one refer to
Figure 2-15 Rack Mounted
If the system required two or three chassis simultaneously put on the shelf plate of 19 inch rack, the
space must be required between chassis for heat ventilation.
Do not stack two or three chassis per one shelf plate.
1.7 Installing the Expansion Chassis
1.7.1
General
Each Expansion Chassis is connected to the Main Chassis individually. The EXIFB-C1 board must be
installed on the CPU board in the Main Chassis. And the EXIFE-C1 board must be installed on the
Each Expansion Chassis.
INSTALLING THE MAIN & EXPANSION CHASSIS
Chassis.
44.5 mm (1.75")
Figure 2-15 Rack Mounted Chassis
SL2100
Shelf Plate
48

Advertisement

loading