Download Print this page

NEC SL2100 Hardware Manual page 40

Hide thumbs Also See for SL2100:

Advertisement

ISSUE 4.0
1.1.3
Site Requirements
Each Main or Expansion Chassis can have the optional Battery Box (IP4WW-Battery Box) connected,
before deciding on the mounting location refer to
and
INSTALLING THE EXTERNAL BACKUP
• The system without the IP4WW-Battery Box should be wall-mounted only. The chassis can not be
mounted to the IP4WW-Battery Box. The IP4WW-Battery Box can be installed on either the floor or
wall (horizontally). Ensure enough space exists to allow the installation of additional Chassis and/or
battery box.
• A dedicated 100V-120V/220V/230V/240VAC circuit located within two meters of the Chassis is
required. A separate dedicated AC outlet is necessary for each Chassis.
1.1.4
Environmental Requirements
Meeting established environmental standards maximizes the life of the system. Make sure that the site
is not:
• In direct sunlight or in hot, cold or humid places.
• In dusty areas or in areas where sulfuric gases are produced.
• In places where shocks or vibrations are frequent or strong.
• In places where water or other fluids comes in contact with the equipment.
• In areas near high-frequency machines or electric welders.
• Near computers, telexes, microwaves, air conditioners, etc.
• Near radio antennas (including shortwave).
1.1.5
Unpacking
Items
IP7[ ]-4KSU-C1
4KSU-C1 Chassis
AC Power Cord
Screws (M4.1x25)
Wall-Mounting Template
1.2 Installing the Main Chassis (IP7[ ]-4KSU-C1)
A Chassis has one CPU/EXIFE board slot and four universal slots for legacy line/trunk board. When
the CPU-C1 board is installed in the first chassis, it is called the main chassis. Additional chassis,
called expansion chassis.
An Expansion Chassis can be added increasing system capacity. Each Chassis (Main or Expansion)
is powered by its own power supply.
For the detail of LED (RUN, ALM), refer to
1.3 CPU Board (IP7[ ]-CPU-C1)
1.3.1
Unpacking
Unpack the CPU board and check it against the following list. Inspect for physical damage.
INSTALLING THE MAIN & EXPANSION CHASSIS
Figure 2-8 Horizontal Arrangement of the Chassis
BATTERY.
Table 2-1 Chassis Packing List
List of Contents
Table 4-1 CPU LED
Indications.
SL2100
QTY
1
1
4
1
38

Advertisement

loading