Beko QWIK-PURE 15 Installation And Operation Manual page 54

Table of Contents

Advertisement

QWIK-PURE
®
Illustration
NOTE
54 | 124
Assembly work
Damage due to incorrect hose routing.
Incorrect hose routing can result in property and environmental damage, as well
as impaired operation.
Route all hoses in the shortest possible way.
Install all hoses in such a way that they are free of mechanical stress and
without any kinks.
Lay all hoses in such a way that no mechanical stresses are transferred to
the QWIK‑PURE
and the minimum bending radii of the respective hose are
®
observed.
Do not lay the hoses in a slack manner (sagging).
Installation and operation manual
Description / explanation
26. Set up the assembled QWIK‑PURE
the tapping point.
0 For optimal hose routing, the knurled head
screw can be loosened in order to rotate the
condensate inlet up to 90 degrees by hand.
After turning it, tighten the knurled head
screw hand-tight.
27. Connect the tapping point with the condensate
inlet of the pressure relief chamber with a hose
and secure it against slipping with a hose clamp.
0 Do not lay the hose in a slack manner
(sagging).
28. Tighten the hose clamps hand-tight.
 offset from 
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qwik-pure 30Qwik-pure 60Qwik-pure 90

Table of Contents