Installation and operation manual
8.3 Recommissioning
For recommissioning work to be carried out, the following prerequisites must be fulfilled and the preparatory
tasks must have been completed.
Tools
•
No tool necessary
1.
The work or troubleshooting on QWIK‑PURE
2.
The compressed air supply and voltage supply have been established.
3.
The Modbus connection has been established.
Illustration
Prerequisites
Material
•
No material necessary
Preparatory tasks
is complete.
®
Commissioning work
Description / explanation
1. Slowly open the condensate feed to the
QWIK‑PURE
3 sec
2. Press and hold down the ON/OFF button on the
FRC for 3 seconds.
0 The FRC switches from standby mode to
Protective equipment
Always to be worn:
.
®
normal mode.
QWIK-PURE
®
67 | 124