Beko QWIK-PURE 15 Installation And Operation Manual page 92

Table of Contents

Advertisement

QWIK-PURE
®
Illustration
92 | 124
Installation and operation manual
Description / explanation
6. Loosen the 4 hexagon socket screws until the
SOLENOID VALVES Service-Unit can be removed
from the FRC.
0 The 4 hexagon socket screws are secured in
such a way that they cannot fall out from the
Service-Unit.
7. Remove the SOLENOID VALVES Service-Unit.
8. Dispose of the removed SOLENOID
VALVES Service-Unit properly (see section "14.
Disposal" on page 113).
9. Check the sealing surfaces in the FRC for
damage and dirt.
0 Remove any dirt.
0 If there is any damage, contact
BEKO TECHNOLOGIES Service (see section 
"1.1 Contact" on page 5).
10. Mount the new SOLENOID VALVES Service-Unit
and secure it with the 4 hexagon socket screws.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Qwik-pure 30Qwik-pure 60Qwik-pure 90

Table of Contents