QWIK-PURE
®
13.2 Disassembly work
For disassembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks
must have been completed.
Tools
•
Adjustable spanner
•
Water pump pliers
Illustration
1 x
106 | 124
Prerequisites
Material
•
No material necessary
Disassembly work
Description / explanation
1. Cut off the condensate feed to the QWIK‑PURE
and divert the incoming condensate into a
separate container.
2. Press the menu button once.
Installation and operation manual
Protective equipment
Always to be worn:
®