Installation and operation manual
Illustration
Description / explanation
The discharge process is started.
0 The piston in the FRC will close the
condensate inlet from the pressure relief
chamber into the FRC.
0 The measuring chamber is supplied with
auxiliary air at timed intervals.
0 The condensate is passed into the filter
cartridges.
0 The status LED STATUS BAR flashes blue
and indicates the remaining time until the
service.
Status LED STATUS BAR
4/4 of the length flashes blue
3/4 of the length flashes blue
2/4 of the length flashes blue
1/4 of the length flashes blue
When the minimum filling level in the measuring
chamber is reached, the discharge process stops.
0 The piston in the FRC will open the
condensate inlet from the pressure relief
chamber into the FRC.
0 The status LED STATUS BAR is permanently
lit blue.
0 The measuring chamber is no longer
pressurised with auxiliary air.
3. Cut off the compressed air supply and secure it
against unintentional opening.
4. Carefully depressurise the compressed air hose
at the compressed air connection [D].
5. Disassemble the compressed air hose.
QWIK-PURE
®
Remaining time
100 %
75 %
50 %
25 %
91 | 124