FusionCol8000-E400 Modular Indirect Evaporative
Cooling System
User Manual
(1) FusionCol8000-E
Figure 4-4 Concrete platform for combined installation (unit: mm)
(1) FusionCol8000-E
Step 2 Determine the reference points for installing equipment on the concrete platforms.
Mark the reference points using a marker.
Step 3 Mark the mounting positions for the four corner fittings of the equipment using
an ink fountain and long leather measuring tape.
When marking the mounting positions for corner fittings, ensure that the four
lines form a rectangle.
Step 4 Place the shock absorption pads at the corresponding positions of corner fittings
on the concrete platforms.
Step 5 Adjust the equipment in the required direction, connect the steel hoisting ropes,
and hoist the equipment onto the concrete platforms.
Issue 04 (2022-06-30)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
(2) Concrete platform
(2) Concrete platform