FusionCol8000-E400 Modular Indirect Evaporative
Cooling System
User Manual
When hoisting the equipment, ensure that the four corner fittings of the
equipment are aligned with the marked mounting positions for corner fittings on
the concrete platforms.
Figure 4-5 Hoisting the equipment
Step 6 Secure the equipment to the concrete platform using the right angle brackets.
Issue 04 (2022-06-30)
NO TICE
NO TE
In the combined installation scenario, when hoisting the equipment, place the hook on the
inside of the equipment to prevent the hook from being stuck between the equipment.
Copyright © Huawei Technologies Co., Ltd.
4 System Installation
41