Section 6
Differential protection
1.
In point 5 the settings in T1PPDIF are the following:
•
•
•
2.
The sequence of the HV currents is swapped by wiring towards the IED.
3.
LV current is connected as phase L2 on the preprocessing function block.
86
PhSelW1 = (IL1-IL2)/2
PhSelW2 = IL2
InvW2Curr = Yes
© 2017 - 2023 Hitachi Energy. All rights reserved
1MRK506375-UEN Rev. N
Railway application RER670
Application manual