Commissioning Tool∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙∙76 - Fujitsu AIRSTAGE UTY-ASGX Manual

Table of Contents

Advertisement

4-4
Commissioning tool
The commissioning tool is started with the
area.
Test run commands can be executed with the commissioning tool. During test running, the
outdoor unit/indoor unit sensor data can be saved (commissioning log data). After the end of
test running, this data can be exported in CSV file format.
The exported CSV file can be used in commissioning report generation by reading the CSV
file by Excel or other spreadsheet application.
The commissioning screen is automatically refreshed and the latest status is displayed every
30 seconds.
5-7-1
Name∙and∙function∙of∙each∙area
Control∙area∙(initial∙display)
Ref No.
Test Pattern Select
Clear data
CSV
Close
Stop
Start
76
Displays the refrigerant circuit address.
Selects "Cooling Test" / "Heating Test" . When selection is switched, unit
button selections are all reset.
Clears all the commissioning log data of the displayed refrigerant circuit.
Creates the commissioning log data to an arbitrary file as a CSV file.
Closes the commissioning tool screen. Test running is not stopped at exit-
ing.
Executes a stop command for all the indoor units of the relevant refriger-
ant circuit.
Executes the test run command for the selected unit.
After the Start button was clicked, unit button selection cannot be
changed. If there is even 1 indoor unit currently being operated by control,
etc. from another unit, test run commands cannot be executed. Use the
Stop button and stop all the units in advance.
button of the detail screen control
Copyright© 2009-2016 Fujitsu General Limited. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents