Fujitsu AIRSTAGE UTY-ASGX Manual page 84

Table of Contents

Advertisement

5-7-3
Commissioning report generation
There is a template to easily generate a commissioning report. (*1)
A commissioning report can be easily generated by reading the CSV file generated by the
commissioning tool to this template.
Since there is a template named "CommissioningReport.xls" at C:\Program
Files\VRF System\Service Tool, open that file with Excel. (*1)
Display the started Excel "Creation" sheet.
A screen like that shown below is displayed. (*2)
Overview of each sheet
Creation
Cover
SystemList
TestRunResult
ConstructionInformation
OutSystemListTemp
InSystemListTemp
OutTestRunTemp
InTestRunTemp
DataSheet
82
This screen is used to specify the read CSV file and execute commis-
sioning report generation.
Commissioning report cover (*3)
System list
Test run result
Construction information (*3)
System list template (outdoor unit)
System list template (indoor unit)
Test run result template (outdoor unit)
Test run result template (indoor unit)
Temporarily saves the CSV data. This sheet is used in report genera-
tion processing.
Copyright© 2009-2016 Fujitsu General Limited. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents