The button of units that have entered the test run state is displayed in green.
When an indoor unit was selected and started, the selected indoor units enter the test
run state. When an outdoor unit was selected and started, all the indoor units enter the
test run state.
After test run starts, new test run objective units cannot be added. Perform test run
stop of
, clear the commissioning log data of
from the initial state.
The commissioning log data of the selected units (italic bold characters) is saved by
clicking the
No. that generated the commissioning log data changes to blue.
80
, as required, and repeat operation
button. On the screen, the background color of the unit