Mitsubishi Electric MELSEC-QD75MH1 User Manual page 621

Positioning module
Table of Contents

Advertisement

12 CONTROL SUB FUNCTIONS
Cd.3 Positioning
start No.
Positioning start
(Y10 to Y13)
[2] OPR
The absolute position system can establish the location of the OPR, using "Data
set method", "Near-point dog" and "Count method" OPR method.
In the "Data set method" OPR method, the location to which the location of the
OPR position is moved by manual operation (JOG operation/manual pulse
generator operation) is treated as the OPR position.
Fig. 12.34 Operation of the OPR execution
Movement range for the machine
Moved to this position by
manual operation.
The stop position during
OPR execution is stored as the OPR position.
9001 (OPR destignation)
12 - 60
MELSEC-Q

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-q seriesMelsec-qd75mh2Melsec-qd75mh4

Table of Contents