NEC Express5800/R120b-1 User Manual page 412

Express5800/r120b-1
Table of Contents

Advertisement

9-56 Upgrading Your Server
9.
Install the RAID controller in the server chassis, and secure it with the screws that were
used to secure the bracket.
10.
Install the components you removed.
3.5-inch RAID controller
1.
See page 9-4 to prepare.
2.
Pull out the server from the rack (as described on page 9-4).
3.
Remove the top cover (as described on page 9-24).
4.
Remove the screws holding the riser card in place.
5.
Remove the riser card.
Screws

Advertisement

Table of Contents
loading

Table of Contents