NEC Express5800/R120b-1 User Manual page 437

Express5800/r120b-1
Table of Contents

Advertisement

7.
Insert the optional DVD SuperMULTI drive into the slot.
Align the screw holes on the optional DVD SuperMULTI drive with claws on the slot, and
then move the drive to the right.
8.
Secure the optional DVD SuperMULTI drive with optical disk drive bracket. Then,
tighten the screw.
Move the bracket to the right, viewed from the front of server.
9.
Connect the SATA cable to optional DVD SuperMULTI drive. Then, fix the SATA cable
with cable fixing bracket.
10.
Install the components you removed previously.
<1>
Cable fixing bracket
Optical disk drive bracket
Screw
Upgrading Your Server 9-81
<2>

Advertisement

Table of Contents
loading

Table of Contents