Reactive Power Control - Huawei SmartLogger2000 User Manual

Hide thumbs Also See for SmartLogger2000:
Table of Contents

Advertisement

SmartLogger2000-(10-C, 11-C)
User Manual
Figure 8-1 Active power control

8.1.2 Reactive Power Control

According to standard requirements, the SmartLogger can send remote dispatching commands
in real time to connected inverters, which ensures that the PV power station can quickly
respond to the requirements of the power grid company.
Large-scale power stations are required to adjust the voltage at the grid-connected point.
Power grid dispatcher enables the power station to absorb or add the reactive power at the
grid-connected point, that is, to enable the reactive power compensation, based on the
real-time reactive power transmission status in the power grid.
The SmartLogger controls the reactive power of connected inverters only when reactive
power control is set to Enable.
You need to log in as Special User that has the permission to set the reactive power control.
Choose Settings > Reactive Power Control to enter the page.
Issue Draft A (2017-02-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Power Grid Scheduling
164

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartlogger 2011-cSmartlogger2010-c

Table of Contents