SmartLogger2000-(10-C, 11-C)
User Manual
4.5.3 Connecting the SUN2000 Through AC Power Cables
Context
The SmartLogger is integrated with the PLC central coordinator (CCO) that can work with
the SUN2000 integrated with the PLC station (STA) to implement power line communication
(PLC) networking over power cables.
Procedure
Step 1 Connect one end of the delivered AC power cables to an MCB.
Step 2 Connect the other end of the cables to the AC1 and AC2 ports on the SmartLogger
respectively.
Figure 4-12 Connecting AC power cables to the SmartLogger
Table 4-5
Table 4-5 Components
No.
1
2
3
Issue Draft A (2017-02-15)
describes the components shown in
Component
Specifications
Busbar A/B/C
N/A
Rated voltage ≥ 800 V; rated current: 32
Fuse
A
Rated voltage ≥ 800 V; rated current ≥
Knife fuse
switch box
32 A; number of poles: 3
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-12.
4 Electrical Connection
Quantity
1
3
1
44