Monthly Maintenance; Power Supply And Distribution System - Huawei FusionModule 1000B Maintenance Manual

Air-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Air-Cooled IT Solution
Maintenance Guide
Categ
ory
Fire
extingu
ishing
system

4.3 Monthly Maintenance

4.3.1 Power Supply and Distribution System

Table 4-3 Monthly maintenance checklist for the power supply and distribution system
Item
PDC
Issue 02 (2017-01-10)
Item
Method
properly.
VESDA
Check the
and its
working status of
power
the VESDA and
supply
its power supply.
Method
Check the
indicator.
Check the SPD
indicator and SPD
circuit breaker
status.
Push any button on
the PD510
electricity meter
LCD.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Expected
Result
working status
by viewing the
door status list
in the
management
system. If all
door status icons
under an access
controller blink,
the access
controller is
working
properly.
The VESDA
and its power
supply are
normal.
Expected
Troubleshooting
Result
The
If an indicator is off or dim, replace
three-phase
it by following instructions in the
power
PDC user manual.
indicators are
steady on.
The SPD
If the SPD indicator is red, replace it
indicator is
by following instructions in
green.
Replacing the SPD in a
1. Check whether the SPD
The SPD
indicator is red. If yes, replace it
circuit breaker
by following instructions in
is switched to
Replacing the SPD in a
ON.
2. Switch on the circuit breaker.
1. If the LCD does not display
The PD510
information properly (no display
electricity
or fuzzy), check whether the
meter LCD
power cable is properly
lights up and
4 Routine Maintenance
Troubleshooting
If the VESDA or its power
supply is abnormal,
troubleshoot by following
instructions in documents
delivered with the VESDA.
6.1.3
PDC.
6.1.3
PDC.
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionmodule 1000

Table of Contents