Replacing A Fire Cylinder (Ce) - Huawei FusionModule 1000B Maintenance Manual

Air-cooled it solution
Table of Contents

Advertisement

FusionModule1000B Air-Cooled IT Solution
Maintenance Guide
Figure 6-90 Connecting battery cables
Distinguish the positive and negative battery terminals when connecting battery cables.
----End
Follow-up Procedure
Dispose of the removed extinguishant control panel batteries that are confirmed faulty.

6.5.9 Replacing a Fire Cylinder (CE)

Prerequisites
Impact on the System
The fire extinguishing system stops working during the replacement.
Preparations
Tools: pipe wrench, pallet truck, Phillips screwdriver, adjustable wrench, protective gloves
Materials: spare fire cylinder, sealing tape
Documents: fire extinguishing device layout diagram (CE)
Skill requirement: fire engineer
Issue 02 (2017-01-10)
A fire cylinder needs to be replaced.
A spare fire cylinder of the same model is available and functional.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Parts Replacement
171

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionmodule 1000

Table of Contents