ABB PSTX30 Installation And Commissioning Manual page 9

Hide thumbs Also See for PSTX30:
Table of Contents

Advertisement

1.2
Intended audience
1.2.1
General
The Installation and commissioning manual is intended for
authorized installation, commissioning, and maintenance
personnel.
1.2.2
Requirements for personnel
The installation personnel must have a basic knowledge
in handling electric equipment. The commissioning and
maintenance personnel must be well experienced in
using electric equipment. ABB personell have to obey the
instructions in ABB CISE 15.4.
1.3
Revision notes and other
documents
For latest information on revisions and other
documents related to the PSTX softstarters, please
check ABB Website. Select the link Control Products on
the site, and then continue to Softstarters.
1.4
Acronyms and abbreviations
The acronyms and abbreviations described in table 3 are
used in this manual.
Table 3
Acronyms and abbreviations
Acronym/
Description
abbreviation
BP
By-pass
DOL
Direct-on-line
EOL
Electronic overload
FB
Fieldbus
FBP
Fieldbus Plug
HMI
Human-Machine Interface
I e
Rated operational current
IT
Information Technology
LED
Light Emitting Diode
PCBA
Printed Circuit Board Assembly
PLC
Programmable Logic Controller
PTC
Positive Temperature Coefficient
SC
Short Circuit
SCR
Silicon Controlled Rectifier (thyristor)
TOR
Top of Ramp (full voltage/Full-On)
U c
Rated control circuit voltage, used for
controlling the softstarter. *
U e
Rated operational voltage on the motor (three
phase main voltage feeding the motor). *
U s
Rated control supply voltage, feeding the
electronics in the softstarter. *
*) For definition see IEC 60947-1 edition 5.0