Panasonic LB-DH7 Series Installation Manual page 30

Data archiver
Hide thumbs Also See for LB-DH7 Series:
Table of Contents

Advertisement

Installation of this unit
8
Inspect the UD guide part of the gear rack on
the drawer side.
≥ Use the UD guide check fixture to check all the gaps in
the connection parts of the gear rack.
UD guide check fixture
≥ UD guide check: pattern 1
Gap under 1.5 mm (0.06q)
Check the gap between the gear rack on the
drawer side and the UD guide by moving the
fixture down.
OK
Under 1.5 mm
(0.06q)
Installation
Error
1.5 mm (0.06q) or more
Refer to the
following "Error
flow chart".
30
≥ UD guide check: pattern 2
(for parts other than the connection with the
Bottom Module)
Gap
under 1.5 mm
(0.06q)
Check the gap between the gear rack on the
drawer side and the UD guide by moving the
fixture up.
OK
Under 1.5 mm
(0.06q)
≥ UD guide check: pattern 3
(for the connection with the Bottom Module)
Gap
under 1.5 mm
(0.06q)
Check the gap between the gear rack on
the drawer side and the UD guide by
moving the fixture down to the Bottom
Module side.
OK
Under 1.5 mm
(0.06q)
Error
1.5 mm (0.06q) or more
Refer to the
following "Error
flow chart".
Error
1.5 mm (0.06q) or more
Refer to the
following "Error
flow chart".

Advertisement

Table of Contents
loading

Table of Contents